Islais Creek Transport, San Francisco,
CA
Islais Creek Contract E is a 1,100-foot
long combined sewer and stormwater transport/storage structure
that consists of a 250 foot long 10'-6" diameter tunnel,
a 500 foot long 12'-0" diameter tunnel, and 350 feet of cast-in-place
concrete box culvert constructed within soldier pile tremie concrete
(SPTC) walls. Our scope of services included providing resident
engineering, construction management and contract administration
services, while Dr. Brierley served as officer-in-charge.
|
| |
|
|
| |
 |
Folsom 2 East Pipeline, Sacramento,
CA
The Folsom East Interceptor 2B project
includes two 66-inch-diameter tunnels constructed using a Lovat
TBM totaling approximately 3000 feet in length, with required
for passage under U.S. Hwy SO. Brierley Associates Denver office
assisted with tunnel design including all drawings, specifications,
and cost estimates for tunneling and associated shafts, in addition
to providing assistance during construction with tunnel submittal
reviews and the monitoring of the proposed ground improvement
procedures.
|
| |
|
|
| |
 |
Papago Freeway Drainage Tunnels, Phoenix,
AZ
During construction of storm drainage
tunnels under Phoenix, Dr. Brierley oversaw the provision of geotechnical
engineering, compaction and chemical grouting design, construction
administration, and tunnel inspection services for the Arizona
Department of Transportation. The project consisted of 27,000
feet of 21-foot finished diameter tunnel and 6,650 feet of 14
ft finished diameter tunnel driven through loose river run gravel,
for the purposes of moving water from a depression in the Papago
Freeway to the Salt River.
|
| |
|
|
| |
 |
Las Vegas Pedestrian Rotunda, Las
Vegas, NV
Services for the Nevada Department
of Transportation included preparation of design documents and
cost estimate for a conceptual design of a short pedestrian tunnel