 |
 |
|
|
| |
 |
Quarry Access Tunnel, Leesburg, VA
Provided consulting, preliminary
design services and cost estimates for a tunnel or tunnels linking
two quarries. The tunnel(s) will be 250-foot long and will allow
direct access for haul trucks beneath existing park land and bicycle
paths to link a newly reopened quarry to existing process facilities.
|
| |
|
|
| |
 |
East Highwall Remediation Design,
Morrison, CO
Cooley Gravel Company requested
assistance in evaluating conditions and proposing a stabilization
measure for a 200-foot high slope in a fractured rock mass on
the eastern side of the quarry, which exhibited signs of instability.
A study was conducted including field mapping of features in rock
outcrops, determination of rock mass strength, and evaluation
of the stability of individual benches and of the overall slope,
followed by an interim configuration was proposed to flatten the
slope and expose the rock for more detailed visual observations.
|
| |
|
|
| |
 |
Bromley Lakes Pit, Ready Mixed Pit
No.1, and
Erger's Pond Pit, Brighton, CO
Technical services provided include
DMG permitting revisions and amendments, annual report preparation,
geotechnical stability evaluations, slurry wall feasibility and
design, 404 permitting, zoning assistance, and general management
consultation.
|
| |
|
|
|